Azraq

Updated 21 August 2026

Roadmap

Reducing the technical barrier to KRI configuration, dashboard authoring, and workflow automation.

  • In progress
  • Planned
  • Exploring
  • Small
  • Medium
  • Big

Q3 2026

Now57% elapsed5
  1. In progress· Q3 2026Big

    Platform APIs and integrations

    The developer surface: getting data in, getting events out, and being able to build against Azraq without a support ticket.

    In this block

    • Full REST API for KRI ingestion
    • Webhook triggers on score change
    • Client data connectors via config file
    • Developer documentation and sandbox
  2. In progress· Q3 2026Big

    Data centre dataset

    The canonical data centre dataset every other feature reads from, and the pipeline that keeps it accurate.

    In this block

    • Validated and enriched DC dataset, with provenance on every field
    • DC asset catalogue and operator profiles
    • Energy pricing module
  3. In progress· Q3 2026Medium

    Market pricing and benchmarks

    What compute and capacity actually cost right now, and how a given site or operator compares to the market.

    In this block

    • Market intelligence dashboard: GPU and compute pricing, supply and demand signals, AI Compute Stress Index
    • GPU compute pricing and market benchmarks
    • Historical benchmark and market analysis
  4. In progress· Q3 2026Big

    News monitoring and risk signals

    Continuous monitoring of the data centre market, scored into risk signals rather than left as a reading list.

    In this block

    • DC news feed with alert triggers
    • News ingestion and aggregation pipeline
    • News sentiment scoring across the six risk pillars
    • Automated DC research reports and live dashboard
  5. In progress· Q3 2026Big

    Risk scoring engine

    The first working simulation layer underneath the scores, and the research method that feeds it.

    In this block

    • Financial risk simulation engine
    • Site research methodology for KRIs

Q4 2026

5
  1. Planned· Q4 2026Big

    Configuration without engineering

    Moving model configuration out of engineering hands and into yours, safely.

    In this block

    • Drag-and-drop KRI weight editor
    • Pillar configuration without engineering
    • Rule-based hard gate builder
    • Preview mode before production push
  2. Planned· Q4 2026Big

    Data platform scale-up

    More sources, human review in the loop, and contract-level benchmarking on top of the dataset.

    In this block

    • Platform APIs, tooling and operator workflows
    • Multi-source DC data platform with human review
    • DC technology stack database
    • SLA contract ingestion and benchmarking
  3. Planned· Q4 2026Big

    Deal scoring and technology risk

    Scoring a deal as it moves through diligence, and understanding the technology risk sitting inside it.

    In this block

    • Due-diligence scoring with stage-by-stage rescoring
    • Technology obsolescence and lifecycle intelligence
  4. Planned· Q4 2026Big

    AI site research in the product

    AI-generated site research surfaced in the web app rather than delivered as a document.

    In this block

    • Research output and delivery layer across the product lines
  5. Planned· Q4 2026Medium

    Macroeconomic risk factors

    Modelling how macroeconomic conditions move risk, and how those factors move together.

    In this block

    • Correlated macro risk modelling

Q1 2027

3
  1. Planned· Q1 2027Big

    Dashboards and reporting

    Composing and distributing views without commissioning them.

    In this block

    • No-code dashboard layout tool
    • Client branding and widget library
    • Role-based views (ops, compliance, mgmt)
    • Scheduled report builder
  2. Planned· Q1 2027Big

    Deal sign-off and operator history

    The rest of the deal workflow: an operator's track record going in, sign-off and audit trail coming out.

    In this block

    • Operator performance from historical telemetry
    • Due-diligence checklist, sign-off and audit trail
  3. Planned· Q1 2027Big

    Physical infrastructure risk

    Bringing power, cooling and the building itself into the simulation.

    In this block

    • Physical infrastructure risk modelling

Q2 2027

3
  1. Planned· Q2 2027Big

    Workflow automation and alerting

    Azraq acting inside the systems you already run, instead of being another place to check.

    In this block

    • Trigger-based alerting rules
    • Integration with client ITSM / GRC tools
    • Automated compliance evidence packs
    • AI-assisted KRI calibration suggestions
  2. Planned· Q2 2027Big

    Sector products: insurance and finance

    Purpose-built workflows for the two buyer groups that need their own vocabulary.

    In this block

    • Investor-facing risk intelligence and DD workflows
    • Underwriting intelligence for insurers, brokers and MGAs
  3. Planned· Q2 2027Big

    Cascading failure modelling

    Modelling how a failure in one layer propagates into the others, rather than scoring each layer alone.

    In this block

    • Cross-layer risk propagation

Backlog

5
  1. Exploring· BacklogBig

    Asset degradation over time

    Modelling how assets degrade with age, rather than scoring them at a single point in time.

    In this block

    • Dynamic degradation modelling
  2. Exploring· BacklogBig

    Portfolio risk and KRI models

    Moving from single-asset risk to portfolio exposure, on a broader library of models.

    In this block

    • Portfolio-level risk aggregation
    • Expanded KRI model library
  3. Exploring· BacklogBig

    Supplier and external risk

    Risk that originates outside the estate: the suppliers you depend on, and the wider macro picture.

    In this block

    • Supplier and supply-chain risk scoring
    • Macro factor simulation
  4. Exploring· BacklogMedium

    Country-level data

    Extending the dataset to country-specific sources.

    In this block

    • Country-specific data coverage
  5. Exploring· BacklogMedium

    Ecosystem and infrastructure

    Supporting work with no date attached.

    In this block

    • MC Radar platform infrastructure
    • Partner ecosystem map

Roadmap items are subject to sprint prioritisation and client co-development input. Periods are estimates, not deadlines.